Methods for Adding Demand Response Capability to a Thermostatically Controlled Load with an Existing On-off Controller
Methods for Adding Demand Response Capability to a Thermostatically Controlled Load with an Existing On-off Controller
Journal of Electrical Engineering and Technology. 2015. May, 10(3): 755-765
Copyright © 2015, The Korean Institute of Electrical Engineers
This is an Open-Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/by-nc/3.0/) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.
  • Received : February 21, 2015
  • Accepted : November 17, 2014
  • Published : May 01, 2015
Download
PDF
e-PUB
PubReader
PPT
Export by style
Article
Author
Metrics
Cited by
TagCloud
About the Authors
Young Gyu Jin
Wind energy Gird-Adaptive Technology Research Center, Chonbuk National University, Korea. (ygjin93@snu.ac.kr)
Yong Tae Yoon
Corresponding Author: Dept. of Electrical and Computer Engineering, Seoul National University, Korea. (ytyoon@snu.ac.kr)

Abstract
A thermostatically controlled load (TCL) can be one of the most appropriate resources for demand response (DR) in a smart grid environment. DR capability can be effectively implemented in a TCL with various intelligent control methods. However, because traditional on-off control is still a commonly used method in a TCL, it is useful to develop a method for adding DR capability to the TCL with an existing on-off controller. As a specific realization of supervisory control for implementing DR capability in the TCL, two methods are proposed - a method involving the changing of a set point and a method involving the paralleling of an identified system without delay. The proposed methods are analyzed through the simulations with an electric heater for different power consumption levels in the on-state. Considerable cost benefit can be achieved with the proposed methods when compared with the case without DR. In addition, the observations suggest that a medium power consumption level, instead of the maximum power, in the on-state should be used for consistently obtaining the cost benefit without severe temperature deviation from the specified temperature range for DR.
Keywords
1. Introduction
Recently, more attention has been paid to the role of demand response (DR) to time-varying pricing such as time-of-use (TOU) pricing and critical peak pricing (CPP) [1 - 3] . The benefits of DR include the saving of electricity bills, the reduction of peak demand, the deferred infrastructure investment, and the mitigation of market power from a monopoly or an oligopoly [4 - 6] . These effects can be improved by the advanced metering infrastructure (AMI) and various technologies such as the bidirectional communication capability in smart grids [7 , 8] .
The benefits of DR can be obtained with various types of appliances such as electrical vehicle charging systems, dishwashers, and heating, ventilation and air conditioning (HVAC) systems [9 , 10] . Among the possible systems for DR, this paper focuses on HVAC systems except for the ventilation, which are denoted as thermostatically controlled loads (TCLs). This is because TCLs account for the considerable percentage of residential electricity consumption [11] , and air within the indoor environment can be used as the thermal storage to delay or advance electricity usage [12] . In fact, approximately 48% of the residential electricity consumption was used for heating and cooling in the United States in 2009 [13] . In addition, considering that it is not suitable for the human operators to respond to the frequent changes (e.g., every 5 min) of electricity prices, the automated control can be a desirable scheme for DR [14] . Thus, the possibility of adding a fully automated DR function to TCLs can be another reason for selecting them as the appropriate DR resources in the smart grid environment [15 - 17] . The addition of DR capability in the TCL with an existing on-off controller can be described in the hierarchical structure consisting of supervisory control and regulatory control [18] . In other words, the function of the existing on-off controller corresponds to the regulatory control in the timescale of seconds and the response to the electricity prices for the reduction of electricity cost corresponds to the supervisory control in the timescale of minutes. It is true that DR capability can be effectively implemented in the TCL with the intelligent control methods such as adaptive control and evolutionary algorithm [19 - 21] . However, the traditional control method such as the on-off control is still a commonly used method in the TCL because of low cost [22 , 23] . As a result, it is useful that the TCLs with the existing on-off controller have become newly available DR resources by adding DR capability. The addition of DR capability implies the development of a suitable supervisory control because the existing on-off control corresponds to the regulatory control in the hierarchical structure [18] .
As a specific supervisory control method for implementing DR capability in the TCL, it is proposed to change the set point of the room temperature according to the electricity prices [24] . A linear function, a step function, and an exponential function are also presented in [24] as the possible shapes of the set point change functions. However, the specific set point change function is left as another problem to be addressed by applying other optimization techniques. In [7 , 16 , 17] , the use of on-off control for using TCLs as DR resources is considered. However, those studies focus not on the implementation of the DR function in an individual TCL, but on the centralized direct load control of aggregate TCLs. Decentralized configuration in [18] can be used as another realization of the supervisory control, in which additional controller operates independently and the control signals are generated by combining the output of the additional controller with the output of the existing regulatory controller. However, such a decentralized implementation for adding DR capability to the TCL has not been studied yet. Thus, as specific realizations of the supervisory control in the hierarchical structure, two methods are proposed in this paper for adding DR capability to an individual TCL with an existing on-off controller. One of the proposed methods involves optimally changing a set point, which is a specific realization of the set point change function; and the other method involves paralleling an identified system without delay in parallel with the actual TCL with an existing on-off controller, which is a specific realization of decentralized configuration.
The remainder of this paper is organized as follows. The dynamic model of a TCL and the operation of the on-off controller in a TCL are described in Section 2. Further, the formulation of the DR operation of a TCL without delay as a dynamic programming problem and the determination of the optimal solution are also discussed in Section 2. The proposed methods for adding DR capability to a TCL with an existing on-off controller are presented in Section 3. Section 4 is the simulation section, in which the performance of the proposed methods is analyzed through the simulations with an electric heater. The conclusions are provided in Section 5.
2. DR Operation of a TCL without Delay
- 2.1 Dynamic model of a TCL
The dynamic model of a TCL, which is simple but captures the actual dynamic behavior considerably accurately, is proposed in [25] . In particular, the model is represented as a heating load or a heater as in a differential equation as
PPT Slide
Lager Image
For a cooling load or an air-conditioner, the model is expressed as
PPT Slide
Lager Image
where T is the interior average temperature; τe is the effective thermal constant; Tf is the ambient temperature, to which T asymptotically converges when the heater or the air-conditioner is turned off; Tg is the temperature gain of a heater or an air-conditioner, which relates to the heat capacity of the heater or the air-conditioner; w is a binary variable (0: off, 1: on), which denotes the state of the on-off controller. The parameter τe implies the conditions of homes and buildings about heat loss, such as the status of doors and windows (open or closed) and the insulation. For example, if a window is open, heat loss becomes worse so that τe has a small value, which implies room temperature changes fast toward the ambient temperature [25] . Similarly, insulation is also reflected to τe so that recent improvement in the insulation technology in homes and buildings make τe small. The discretized model of a TCL for computational purpose is presented in [26] .
As an alternative dynamic model of a TCL, it is proposed to use the first-order plus dead-time (FOPDT) system described in [27 , 28] , whose transfer function is represented as
PPT Slide
Lager Image
where K , τ and TD are the gain, time constant and deadtime of the system, respectively. This model is more useful when it is necessary to reduce the computational burden for the identification and control of the system [27 , 28] . The parameter τ is very similar to τe in (1) and (2), which means that τ reflects the conditions of homes and buildings about heat loss, such as the insulation technology applied in homes and buildings. Different from the model in (1) or (2), the FOPDT model does not include an ambient temperature parameter. This is because the parameter of ambient temperature is implicitly reflected in the transfer function in (3) around the operating range. Actually, the ambient temperature cannot be known exactly when the TCL is operating at a target temperature, because the ambient temperature is a converged value when the TCL is continuously turned off. Moreover, with regard to the on-off control of the TCL, the ambient temperature is not used in determining the control. Thus, the FOPDT model is a reasonable choice as a dynamic model of the TCL when the aspects of identification and control are considered. Meanwhile, as will be described in Section 3, the proposed methods are based on the identification, and the focus of these methods is to develop a control strategy for the TCL for DR. Consequently, the FOPDT model is selected as the dynamic model of the TCL in this paper.
- 2.2 Operation of on-off controller
The operation of the existing on-off controller usually makes a binary decision of the on- or off-state [16 , 17] . Especially when the binary decision is on-state, the power consumption level also can be combined. Thus, a variable for indicating the power consumption level during the on-state or Pk is introduced. There is a maximum value for Pk , which is denoted as P max , because Pk is related to tdhe capacity of the TCL. Then, for a heating load, the controller output (or the system input) uk is expressed as
PPT Slide
Lager Image
For a cooling load, it can be similarly represented as
PPT Slide
Lager Image
In (4) and (5), xk , xref , and δ mean room temperature at time k , the set point of room temperature, and the dead band of the on-off control, respectively.
- 2.3 Optimal solution of DR operation without delay
Without the delay TD , H ( s ) in (3) can be represented in the continuous-time domain as
PPT Slide
Lager Image
Let the current time be t 0 and the control input u ( t ) be constant for t 0 t < t 0 + TS , where TS is the sampling time. Then, the solution of (6) can be determined as
PPT Slide
Lager Image
After the time period of TS , the value of (7) becomes
PPT Slide
Lager Image
Thus, (6) can be converted into the discrete-time linear system for the sampling time TS as:
PPT Slide
Lager Image
where
PPT Slide
Lager Image
The sampling time TS corresponds to the timescale of the supervisory control for DR, for example, 5 min for realtime pricing [4 , 29] .
As presented in [30] , the DR function can be formulated as a dynamic programming problem as
PPT Slide
Lager Image
PPT Slide
Lager Image
PPT Slide
Lager Image
where
Jk(xk) cost-to-go function at time k gN(xN) terminal cost gk(xk,uk) transition cost at time k ρk electricity price at time k xk state related to room temperature at time k admissible minimum state at time k admissible maximum state at time k uk control related to electricity consumption at time k minimum control at time k which satisfies the constraint of (11-c) maximum control at time k which satisfies the constraint of (11-c) N number of times control is applied
The cost-go-function Jk ( xk ) can be composed as
PPT Slide
Lager Image
From the principle of optimality of dynamic programming, the optimal cost-to-function
PPT Slide
Lager Image
can be represented as
PPT Slide
Lager Image
By the backward DP procedure from the last time N , the optimal cost-to-function can be derived as [30]
PPT Slide
Lager Image
The first term { ρk A ρ k+1 } uk in (14) shows that
PPT Slide
Lager Image
is linear to the control uk . Then, using this linear property, the optimal solution of (11) is determined as
PPT Slide
Lager Image
It seems that (15) depends only on the price because of the branch condition with only the price term. However, the optimal solution (15) depends not only on the price but also on the room temperature because
PPT Slide
Lager Image
and
PPT Slide
Lager Image
are not constant but variable with respect to the current room temperature xk . This is why
PPT Slide
Lager Image
and
PPT Slide
Lager Image
have the subscript k . For example, suppose that the set point of a heating system is equal to 26℃ . Then,
PPT Slide
Lager Image
may be equal to 0.5 when xk = 25℃ , but
PPT Slide
Lager Image
may increase to 1.0 when xk = 24℃ .
The optimal solution in (15) can be interpreted as that the electricity consumption decreases when the price at the current time period is greater than that in the next time period. This is the same as the general DR operation. In addition, (15) suggests that the determination of high or low price depends on the system characteristics such as the value of A . In order to achieve a significant benefit from DR, the comfort of the user of the TCL should be inevitably sacrificed to some degree [15 , 26] . Thus, it is desirable to give the user the choice of allowed discomfort [26] . For the TCL, this discomfort level corresponds to the temperature range for DR as given as the constraint in (11-c).
3. Methods for Adding DR Capability
When it is assumed that the time delay is a multiple of the sampling time TS , that is, TD = mTS , the discrete-time linear system without delay in (9) can be represented as the system with delay
PPT Slide
Lager Image
Accordingly, the optimal solution in (15) for the TCL without delay should also be modified as
PPT Slide
Lager Image
where
PPT Slide
Lager Image
and
PPT Slide
Lager Image
are the minimum and maximum controls, respectively, at the time index k + m , which satisfies the constraint of (11-c).
The optimal control in (17) is based on the information of the state in the future time index of k + m . Thus, although (17) is valid in a mathematical sense, it has a serious limitation when used in the practical applications owing to the dependence on the future state. Thus, as solutions for practical use, this paper proposes two methods for adding DR capability to a TCL.
- 3.1 Method of changing a set point
In order to resolve the dependence on the unknown future state, (17) can be converted into the optimal law for changing set point. For a TCL such as an electric heater, a rise in room temperature results from more electricity consumption. Thus,
PPT Slide
Lager Image
and
PPT Slide
Lager Image
correspond to
PPT Slide
Lager Image
and
PPT Slide
Lager Image
, respectively. Then, (17) can be transformed into the optimal set point law as
PPT Slide
Lager Image
On the other hand, for a TCL such as an air conditioning system, a decrease in room temperature results from more electricity consumption. Then,
PPT Slide
Lager Image
and
PPT Slide
Lager Image
correspond to
PPT Slide
Lager Image
and
PPT Slide
Lager Image
, respectively, and (17) can be transformed into
PPT Slide
Lager Image
Different from (17), it is possible to apply (18) or (19) to the DR function of a real-life TCL because
PPT Slide
Lager Image
amd
PPT Slide
Lager Image
can be decided in advance as the admissible range of room temperature for the DR function. For example, when the original set point of an electric heater is 25 without regard to DR, the admissible range for DR can be set in advance by the user as [24 , 26 ] for a certain time duration including the future time index of k + 1 + m in (18) or (19). This method of changing a set point is represented as a block diagram in Fig. 1 . The system identification block is intentionally included in Fig. 1 to emphasize the need for the information on the system dynamics when determining
PPT Slide
Lager Image
in (18) or (19). The performance of this method of changing a set point depends entirely on the operation of the existing controller. Thus, when the existing controller is not properly operating, an undesirable situation may happen, in which the addition of DR capability rather increases the cost of power consumption when compared with the case without DR.
PPT Slide
Lager Image
Block diagram of the method of changing a set point.
- 3.2 Method of paralleling an identified system
Let
PPT Slide
Lager Image
and
PPT Slide
Lager Image
be defined as the contributions of the original system structure without the DR function to xk and uk , respectively. Similarly, let
PPT Slide
Lager Image
and
PPT Slide
Lager Image
be defined as the additional components of xk and uk , respectively, owing to the added DR capability. Then, by the superposition property of the linear system, the state xk can be expressed as
PPT Slide
Lager Image
By substituting (20) into (16) gives the system equation with separated state variables as
PPT Slide
Lager Image
Particularly,
PPT Slide
Lager Image
can be interpreted as the output of the existing on-off controller when the DR function is not included. However, this separation cannot be observed explicitly in real situations.
In the method of paralleling an identified system without delay, the operation of the original system structure is not modified. In other words, the existing on-off controller operates according to the specified reference value, as it originally does as in (4) or (5). Instead, DR capability is implemented by adding the control output for DR determined from the identified system without delay, which is an ideal system for computational purpose, as follows:
PPT Slide
Lager Image
Then, the constraints in (11-c) should be changed for the identified system of (22) as
PPT Slide
Lager Image
where xref is the specified reference value of the existing controller set by the user regardless of the DR function. Further, from (9) and (15), the optimal DR control of the identified system without delay for a TCL such as an electric heater can be determined as
PPT Slide
Lager Image
Similarly, for a TCL such as an air conditioning system, the optimal DR control of the identified system without delay can be expressed as
PPT Slide
Lager Image
When
PPT Slide
Lager Image
and
PPT Slide
Lager Image
are set as constant values for all k , then, from the optimal control law for the system without delay,
PPT Slide
Lager Image
has a value of either
PPT Slide
Lager Image
or
PPT Slide
Lager Image
. This value indicates an allowed deviation of temperature for DR set by the user. Then, the optimal control
PPT Slide
Lager Image
in (24) or (25) can have possibly four values as
PPT Slide
Lager Image
where the values correspond respectively to the following four cases of state transition as
PPT Slide
Lager Image
The values in (26) can be interpreted as the supervisory control bias for DR, which is added to the output of the existing on-off controller. When one of the values in (26) is added to the output of the existing on-off controller, the case can happen when the resulting value is less than zero or greater than Pmax . However, the lower limit (zero) and the upper limit ( Pmax ) are the physical constraints of the TCL; therefore, the saturation function is applied before the TCL as
PPT Slide
Lager Image
For an input to the existing on-off controller, because of the relationship of
PPT Slide
Lager Image
, the error ek provided into the existing on-off controller becomes
PPT Slide
Lager Image
Thus, the reference of the existing controller is changed from xref to
PPT Slide
Lager Image
. It should be noted that the value of
PPT Slide
Lager Image
is not a measured quantity; however, it can be computationally determined from the identified system with the optimal control of (24) or (25). This method of paralleling an identified system without delay is represented schematically in Fig. 2 .
PPT Slide
Lager Image
Block diagram of the method of paralleling an identified system without delay.
- 3.3 Comments on payback effect
The proposed methods are intended for adding DR capability to an individual TCL. However, when the number of TCL becomes large and all the TCLs operate in the same way according to the common electricity prices, the stability of the power system can be affected by those collective DR operations [16] . In particular, the adverse effect such as new peak demand is likely to occur during an off-peak period just after the DR operation stops [15] . The fluctuation of the electricity prices may result from the new peak demand. This phenomenon is similar to so-called ‘payback effect’ [31 - 34] , which can appear as a form of delayed consumption when the demand is restored after the service interruption.
The solution to this negative effect of DR operation is the diversity of demand [16 , 25] . Thus, it is necessary to investigate whether the diversity property can hold in the proposed methods to avoid the negative effects. The first diversity element in the proposed methods is the temperature range for DR specified by the user. There is a sort of trade-off between the cost benefit from DR and the comfort level. Thus, the specific temperature range for DR may be different from each user, which makes the distribution of the on- and off-states diversified in time. The second diversity element is the power consumption level of the existing on-off controller set by the user. Different values of Pk at the on-state mean different time durations necessary for the same change of temperature, which in turn makes the distribution of the on- and off-states diversified in time. The last diversity element is specific parameter values of the dynamic model of a TCL as given in (3). Because the area and structure of the room space are all different, the specific dynamic model cannot be equal to each other, which supports the diversification of the on- and off-states in time.
4. Simulation and Verification
- 4.1 Simulation settings
In the simulation, an electric heater is considered as a TCL, whose transfer function is the same as that described in [28] and represented as
PPT Slide
Lager Image
where the unit of s is min −1 . Four cases are composed according to the values of TD ; that is, TD is equal to 0 (no delay), 1, 3, and 5 min. The sampling time TS is set to 5 min, considering the update interval of electricity price in real-time pricing [4 , 29] . According to (10), the parameters of the discrete-time linear system are determined as
PPT Slide
Lager Image
The dead band δ in (4) is set to 1, such that the operation of the on-off controller is represented as
PPT Slide
Lager Image
The upper limit of the controller output, or P max , is set to 1. The output values of 0 and 1 correspond to the actual power consumption of 0 kW and 12 kW, respectively [28] . Simulations are performed for two values of Pk in (32), which are Pk = P max = 1.0 and Pk = P max / 2 = 0.5 . Simulation time N is set to 200 min. As the settings of room temperature, the following values are used for all k :
PPT Slide
Lager Image
The supervisory control bias values in the four cases of state transitions for the method of paralleling an identified system can be determined from (26) and (27) as
PPT Slide
Lager Image
As a metric for the performance verification of the proposed methods, the ratio of the cost reduction with DR to the cost without DR, that is, the cost benefit from the added DR capability, is defined as follows:
PPT Slide
Lager Image
The cost benefit can be significantly affected by the electricity prices because the DR operation depends on them. Thus, the simulations are performed 100 times with different profiles of time-varying prices, which are generated from the historical data on the locational marginal prices of PJM in 2008 [35] . Then, the average values of the cost benefit and the temperature are analyzed. The simulations are performed with Matlab/Simulink.
- 4.2 Simulation results
The simulation results of 100 trials in the case when Pk = P max = 1.0 are summarized in Table 1 . There are some items which are not suitable in the case without DR; that is, the cost benefit is always equal to zero by the definition in (35); the average temperature is always the same because of irrelevance to time-varying prices. Thus, they are all indicated with the hyphens in Table 1 .
Simulation results of 100 trials whenPk=Pmaxfor various values of time delay.
PPT Slide
Lager Image
Simulation results of 100 trials when Pk = Pmax for various values of time delay.
It can be observed from Table 1 that the positive cost benefit can be achieved by both methods on average when compared with the case without DR. The cost benefit tends to decrease slightly as the delay increases. Although the degree of difference is not large, the cost benefit with the method of changing a set point (abbreviated as “set point method”) is greater than the cost benefit with the method of paralleling an identified system (abbreviated as “paralleling method”). In terms of the average temperature, there is no significant difference between the proposed methods and the case without DR. Moreover, the average temperature increases as the delay increases in all the cases without DR and with the proposed methods. This is because of the application of full power in the on-state, which renders the overshoot above the high temperature bound become larger than the overshoot below the low temperature bound. This can be clearly observed from the temperature variation of a selected trial shown in Fig. 3 , where the range of DR is also indicated as the shaded band.
PPT Slide
Lager Image
Variation in the temperature and control inputs to TCL for a selected trial among 100 trials when Pk = Pmax; (a) TD = 0; (b) TD = 1min; (c) TD = 3min; (d) TD = 5min.
The oscillatory temperature variation is the inherent characteristic of the on-off controller; therefore, the deviation from xref appears in all cases without DR and it becomes large as the delay increase. In other words, the on-off controller produces overshoot and undershoot around a set point of room temperature even without DR and the proposed methods. Similarly, the range for DR in the proposed method becomes a kind of a loose constraint for the on-off controller because deviation of room temperature from the range for DR appears. However, the important thing is that cost benefit can be achieved from the proposed methods for DR without causing excessive deviation compared to the case without DR. The temperature deviations of the proposed methods increase compared to the case without DR. Between the proposed methods, the paralleling method is better than the set point method for the deviation from the temperature range when the delay is small. On the contrary, when the delay is large, the set point method becomes a better choice than the paralleling method.
The control inputs to the TCL for various values of TD are also shown in Fig. 3 along with the corresponding variations in temperature. For the set point method, the values in the on- and off-states are 1 and 0, respectively, which are the same as in the case without DR. However, the time instants in the two methods are different. The power consumption is advanced in time by adjusting a set point when the electricity price is low in the case with the set point method. This is the reason for achieving the cost benefit with the set point method. On the other hand, the values in the on- and off-states in the case with the paralleling method are different from the case without DR. In other words, there are eight values by combining the on/off states and four values from the identified system as given in (34). However, only four values appear as the actual control signal owing to the saturation constraints of the existing on-off controller. This differentiation of the control input contributes to the cost benefit in the case with the paralleling method.
Although the cost benefit can be achieved on the average with the proposed method when compared with the case without DR, the situation can happen when the cost in the cases with the proposed methods is even greater according to the specific profile of the prices. The numbers of trials with the negative cost benefit for various values of delay are listed in Table 2 . The reason for the negative cost benefit is the bigger overshoot within the high temperature area, which results in more power consumption. The negative cost benefit occurs slightly more often when the delay is greater. Between the two methods, the set point method is slightly better than the paralleling method in terms of the occurrence of the negative cost benefit.
Number of trials among 100 trials with the negative cost benefit whenPk=Pmax.
PPT Slide
Lager Image
Number of trials among 100 trials with the negative cost benefit when Pk = Pmax.
Particularly in the paralleling method, the saturation function of the existing on-off controller prevents the control input of the identified system from being fully applied. Such a negative saturation effect can be relieved by setting lower power in the on-state of the on-off controller, for example, Pk = P max / 2 = 0.5 instead of Pk = P max = 1.0 . The simulation results of 100 trials for the case when Pk = P max / 2 = 0.5 are summarized in Table 3 . It can be observed from Table 3 that the performance of the paralleling method is significantly improved when compared with the results when Pk = P max as given in Table 1 . Moreover, in contrast to the results when Pk = P max , the cost benefit with the paralleling method is better than that with the set point method. In the same vein, according to the number of trials among 100 trials with the negative cost benefit when Pk = P max / 2 as listed in Table 4 , the case with the negative cost benefit does not occur with the paralleling method. These performance improvements for the paralleling method are because of the increase in the number of possible control inputs. In other words, six values among the possible eight values are included as the final control input when Pk = P max /2, while four values are included when Pk = P max . This increase in the number of the control input for the paralleling method can be clearly observed in the time variation of the control input for a selected trial as shown in Fig. 4 .
Simulation results of 100 trials whenPk=Pmax/2 for various values of time delay.
PPT Slide
Lager Image
Simulation results of 100 trials when Pk = Pmax/2 for various values of time delay.
Number of trials among 100 trials with the negative cost benefit whenPk=Pmax/2.
PPT Slide
Lager Image
Number of trials among 100 trials with the negative cost benefit when Pk = Pmax/2.
PPT Slide
Lager Image
Variation in the temperature and control inputs to TCL for a selected trial among 100 trials when Pk = Pmax/2; (a) TD = 0; (b) TD = 1min; (c) TD = 3min; (d) TD = 5min.
When compared with the results in the case with Pk = P max = 1.0 , the common observations for the two methods when Pk = P max / 2 = 0.5 can be described as follows; the average temperature is closer to the user set point; the standard deviation of both the temperature and the cost benefit becomes smaller; the possibility of the negative cost benefit becomes low. Consequently, it is recommended to set a suitable power consumption level of the existing controller in the on-state instead of the maximum power level, when the cost benefit is required to be consistently achieved by adding DR capability to a TCL with an existing on-off controller. However, when the power consumption level in the on-state is considerably closer or equal to the maximum power level, the set point method is recommended over the paralleling method because the cost benefit for the set point method is slightly better than that for the paralleling method, and the possibility of the negative cost benefit is slightly lower.
5. Conclusion
It is necessary to add the DR function to the TCLs in the smart grid environment for achieving desirable benefits of DR because a TCL can be one of the most appropriate resources for the DR. There are still a considerable number of TCLs using an on-off controller. Thus, two methods were proposed to add the DR function to the TCL with the existing on-off controller — a method of changing a set point and a method of paralleling an identified system without delay. These methods were derived from the optimal solution of dynamic programming.
The proposed methods were verified through the simulations with an electric heater for different power consumption levels in the on-state. The simulation results show that considerable cost benefit can be achieved for both the proposed methods when compared with the case without DR. Although the cost benefit can be obtained when the maximum power is set in the on-state, the use of the medium power consumption level in the on-state results in more benefits such as the reduced temperature deviation from the specified temperature range for DR and low possibility of negative cost benefit. Consequently, it can be concluded that it is important to set a suitable power consumption level of the existing on-off controller in the on-state in order to consistently achieve the cost benefit. It can also be suggested that, particularly when the delay is greater, the method of changing a set point can be a better choice over the method of paralleling an identified system.
BIO
Young Gyu Jin He received B.S., M.S., and Ph.D. degrees in Electrical Engineering from Seoul National University in 1999, 2001, and 2014, respectively. He had worked for KT Inc. during 2002-2010. Currently, he is a research professor at WeGAT center, Chonbuk National University. His research interests include operation in smart grid/microgrid, wind farm control and power economics.
Yong Tae Yoon He received his B.S., M. Eng., and Ph.D. degrees from M.I.T., USA in 1995, 1997, and 2001, respectively. Currently, he is a Professor in the Department of Electrical and Computer Engineering at Seoul National University, Korea. His research interests include power economics, smart grid/microgrid and decentralized operation.
References
Faruqui Ahmad , George Stephen 2005 “Quantifying Customer Response to Dynamic Pricing,” Electricity J. 18 (4) 53 - 63
Herter Karen , McAuliffe Patrick , Rosenfeld Arthur 2007 “An Exploratory Analysis of California Residential Customer Response to Critical Peak Pricing of Electricity,” Energy 32 25 - 34    DOI : 10.1016/j.energy.2006.01.014
Tahmasebi Mehrdad , Pasupuleti Jagadeesh 2013 “Demand Response Impact on Market Operator’s Revenue and Load Profile of a Grid Connected with Wind Power Plants,” J. Electr. Eng. Technol. 8 (1) 46 - 52    DOI : 10.5370/JEET.2013.8.1.046
Kirschen Daniel S. 2003 “Demand-Side View of Electricity Markets,” IEEE Trans. Power Syst. 18 (2) 520 - 527    DOI : 10.1109/TPWRS.2003.810692
Albadi Mohamed H. , El-Saadany Ehab F. 2008 “A Summary of Demand Response in Electricity Markets,” Electr. Power Syst. Res. 78 1989 - 1996    DOI : 10.1016/j.epsr.2008.04.002
Won Jong-Ryul , Song Kyung-Bin 2013 “An Analysis on Power Demand Reduction Effects of Demand Response Systems in the Smart Grid Environment in Korea,” J. Electr. Eng. Technol. 8 (6) 1296 - 1304    DOI : 10.5370/JEET.2013.8.6.1296
Conejo Antonio J. , Morales Juan M. , Baringo Luis 2010 “Real-Time Demand Response Model,” IEEE Trans. Smart Grid 1 (3) 236 - 242    DOI : 10.1109/TSG.2010.2078843
Medina Jose , Muller Nelson , Roytelman Ilya 2010 “Demand Response and Distribution Grid Operations: Opportunities and Challenges,” IEEE Trans. Smart Grid 1 (2) 193 - 198    DOI : 10.1109/TSG.2010.2050156
Mohsenian-Rad Amir-hamed , Leon-Garcia Alberto 2010 “Optimal Residential Load Control with Price Prediction in Real-Time Electricity Pricing Environments,” IEEE Trans. Smart Grid 1 (2) 120 - 133    DOI : 10.1109/TSG.2010.2055903
Kim Seung-Jun , Giannakis Georgios B. 2011 “Efficient and Scalable Demand Response for the Smart Power Grid,” IEEE International Workshop on Computa-tional Advances in Multi-Sensor Adaptive Processing 109 - 112
Smith Virginia , Sookoor Tamim , Whitehouse Kamin 2012 “Modeling Building Thermal Response to HVAC Zoning,” ACM SIGBED Review 9 (3) 39 - 45    DOI : 10.1145/2367580.2367587
Motegi Naoya 2007 Introduction to Commercial Building Control Strategies and Techniques for Demand Response Lawrence Berkeley National Laboratory
Residential Energy Consumption Survey of U.S. Energy Information Administration Available online at
Martinez Mark S. 2006 Demand Response Enabling Technologies for Small-Medium Businesses Edison Company Southern California
Pipattanasomporn Manisa , Kuzlu Murat , Rahman Saifur 2012 “An Algorithm for Intelligent Home Energy Management and Demand Response Analysis,” IEEE Trans. Smart Grid 3 (4) 2166 - 2173    DOI : 10.1109/TSG.2012.2201182
Callaway Duncan S. 2009 “Tapping the Energy Storage Potential in Electric Loads to Deliver Load Following and Regulation, with Application to Wind Energy,” Energy Convers. Management 50 1389 - 1400    DOI : 10.1016/j.enconman.2008.12.012
Mathieu Johanna L. , Koch Stephan , Callaway Duncan S. 2013 State Estimation and Control of Electric Loads to Manage Real-Time Energy Imbalance,” IEEE Trans. Power Syst. 28 (1) 430 - 440    DOI : 10.1109/TPWRS.2012.2204074
Skogestad Sigurd , Postlethwaite Ian 2001 Multivariable Feedback Control-Analysis and Design 2nd ed. John Wiley & Sons
Wang Shengwei , Ma Zhenjun 2008 “Supervisory and Optimal Control of Building HVAC Systems: A Review,” HVAC&R Research 14 3 - 32    DOI : 10.1080/10789669.2008.10390991
Huang Kun-Yuan , Chin Hong-Chan , Huang Yann-Chang 2004 “A Model Reference Adaptive Control Strategy for Interruptible Load Management,” IEEE Trans. Power Syst. 19 (1) 683 - 689    DOI : 10.1109/TPWRS.2003.821444
Yao Leehter , Chang Wen-Chi , Yen Rong-Liang 2005 “An Iterative Deepening Genetic Algorithm for Scheduling of Direct Load Control,” IEEE Trans. Power Syst. 20 (3) 1414 - 1421    DOI : 10.1109/TPWRS.2005.852151
Underwood Chris P. 1999 HVAC Control Systems: Modelling, Analysis and Design Routledge
Argüello-Serrano Betzaida , Vélez-Reyes Miguel 1999 “Nonlinear Control of a Heating, Ventilating, and Air Conditioning System with Thermal Load Estimation,” IEEE Trans. Control Syst. 7 (1) 56 - 63    DOI : 10.1109/87.736752
Lu Ning , Katipamula Srinivas 2005 “Control Strategies of Thermostatically Controlled Appliances in a Competitive Electricity Market,” IEEE PES General Meeting 202 - 207
Ihara Satoru , Schweppe Fred C. 1981 “Physically Based Modeling of Cold Load Pickup,” IEEE Trans. Power Apparatus and Syst. PAS-100 (9) 4142 - 4150    DOI : 10.1109/TPAS.1981.316965
Mortensen Richard E. , Haggerty Kevin P. 1988 “A Stochastic Computer Model for Heating and Cooling Loads,” IEEE Trans. Power Syst. 3 (3) 1213 - 1219    DOI : 10.1109/59.14584
Qu Guang , Zaheeruddin M. 2004 “Real-time Tuning of PI Controllers in HVAC Systems,” Int. J. Energy Res. 28 1313 - 1327    DOI : 10.1002/er.1030
Bai Jianbo , Zhang Xiaosong 2007 “A New Adaptive PI Controller and Its Application in HVAC Systems,” Energy Convers. Management 48 1043 - 1054    DOI : 10.1016/j.enconman.2006.10.023
Lave Lester B. , Spees Kathleen 2007 “Demand Response and Electricity Market Efficiency,” Electr. J. 20 (3) 69 - 85    DOI : 10.1016/j.tej.2007.01.006
Jin Young G. , Choi Tae -Seop , Park Sung C. , Yoon Yong T. 2013 “The Design of an Optimal Demand Response Controller Under Real Time Electricity Pricing,” J. Electr. Eng. Technol. 8 (3) 612 - 618
Cohen Arthur I. , Wang Connie C. 1988 “An Optimization Method for Load Management Scheduling,“ IEEE Trans. Power Syst. 3 (2) 1213 - 1219    DOI : 10.1109/59.14584
Wei Deh-Chang , Chen Nanming 1995 “Air Conditioner Direct Load Control by Multi-Pass Dynamic Programming,” IEEE Trans. Power Syst. 10 (1) 307 - 313    DOI : 10.1109/59.373916
Kurucz Charles , Sim Steven , Brandt Dennis 1996 “A Linear Programming Model for Reducing System Peak Through Customer Load Control Programs,” IEEE Trans. Power Syst. 11 (4) 1817 - 1824    DOI : 10.1109/59.544648
Karangelos Efthymios , Bouffard Francois 2012 “Towards Full Integration of Demand-Side Resources in Joint Forward Energy/Reserve Electricity Markets,“ IEEE Trans. Power Syst. 27 (1) 280 - 289    DOI : 10.1109/TPWRS.2011.2163949
Markets & Operations Data of PJM Available online at