A Study on a Catenary Impedance Estimation Technique using Boosting Current Compensation Based on Current Division Characteristics of an AT Feeding System
A Study on a Catenary Impedance Estimation Technique using Boosting Current Compensation Based on Current Division Characteristics of an AT Feeding System
Journal of Electrical Engineering and Technology. 2015. May, 10(3): 1370-1376
Copyright © 2015, The Korean Institute of Electrical Engineers
This is an Open-Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/by-nc/3.0/)which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.
  • Received : October 31, 2014
  • Accepted : January 26, 2015
  • Published : May 01, 2015
Download
PDF
e-PUB
PubReader
PPT
Export by style
Article
Author
Metrics
Cited by
TagCloud
About the Authors
Hosung Jung
Corresponding Author: R&D Strategy Division, Korea Railroad Research Institute, Korea. (hsjung@krri.re.kr)
Hyungchul Kim
Metropolitan Transportation Research Center, Korea Railroad Research Institute, Korea. (hckim@krri.re.kr)
Sang-Hoon Chang
Metropolitan Transportation Research Center, Korea Railroad Research Institute, Korea. (hckim@krri.re.kr)
Joorak Kim
Metropolitan Transportation Research Center, Korea Railroad Research Institute, Korea. (hckim@krri.re.kr)
Myung-Hwan Min
Power Electric & Electronic System Institute, ENTEC electric & electronic Co., Ltd, Korea. (mhmin@entecene.co.kr)
Tae-Pung An
Power Electric & Electronic System Institute, ENTEC electric & electronic Co., Ltd, Korea. (mhmin@entecene.co.kr)
Sung-Il Kwon
Rail systems development research center, Korail, Korea. (kwon 1911@korail.com)

Abstract
Generally, an autotransformer(AT) feeding system consists of double tracks, up and down, with the trolley wire and feeder wire of the up and down tracks connected in the sectioning post(SP). Consequently, load current or fault current flows on two tracks based on catenary impedance characteristics, making it difficult to estimate catenary impedance accurately. This paper presents a technique for the estimation of catenary impedance using boosting current compensation based on the current division characteristics of an AT feeding system to improve the operation performance of impedance relay. To verify the technique, we model an AT feeding system through a power analysis program (PSCAD/EMTDC) and simulate various operation and fault conditions. Through the simulation, we confirmed that the proposed technique has estimated catenary impedance with a similar degree of accuracy to the actual catenary impedance
Keywords
1. Introduction
In Korea, AC railway systems generally have a feeding system using an autotransformer (AT). The AT is installed at substation (SS), sectioning post (SP) and sub-sectioning post (SSP) to reduce the voltage drop of the catenary system and electromagnetic interference in the communication line. Impedance relay is the main protective relay of the AT feeding system, and is installed at a 55kV terminal at the substation to calculate the fault impedance using fault voltage and current. The impedance relay can set the protection range of zone 1 and zone 2, and separately set the operation time for each protection range of the up and down tracks. Generally, zone 1 is set to 90% distance from substation and time is 0.05 sec, while zone 2 is set as 120% distance and time is 0.2 sec for backup protection. Thus, an accurate estimation of catenary impedance depending on distance is important for accurate setting of an impedance relay [1 ~ 3] . But the estimated catenary impedance from the substation is not in proportion to the distance because of the AT installed in SS, SSP and SP. In addition, it is much more difficult to estimate catenary impedance due to the boosting current on AT and the current flow of the other track current, because the double track comprising an up and down track is a tie connection between the up and down track on SP and rail bonding [4 , 5] .
The Carson-Pollaczek equation is usually used in estimating catenary impedance. But this approach has a theoretical limitation in terms of its application to estimations of catenary impedance, taking into account the current boosting on double track. An artificial ground fault test is carried out using a measurement device in the operation line for actual measurement, but it is impossible to set the protection zone to the fault location because of the artificial fault test limitation in the operation line [6 ~ 8]
Thus, in this paper we present a catenary impedance estimation technique that uses boosting current compensation based on the current division characteristics of the AT feeding system. For this technique, 55kV catenary impedance on the up and down track acquired by impedance relay is compared with the conventional technique. The difference of impedance magnitude due to boosting current is expressed in the form of an equation. In this way, a new impedance calculation method using boosting current compensation is presented using existing impedance relay
Finally, the performance of the impedance calculation method using boosting current compensation that is proposed in this paper is evaluated through simulation data depending on various operation and fault conditions of the AT feeding system modeled using a power analysis program.
2. Catenary Impedance Estimation Technique using Boosting Current Compensation
- 2.1 Calculation of catenary impedance between SS and SSP using current division characteristics
To reduce the voltage drop in the AT feeding system on double track, a tie connection between feeder wire and trolley wire on the up and down track at SP is used. This causes load current to flow partially on the down track, in addition to the up track, when the train is in operation on the up track.
The current flow pattern has been evaluated through previous studies, and the overall current flow on the double track is as shown in Fig. 1 [8] .
PPT Slide
Lager Image
Current flow of between substation and subsectioning post
4 closed loops are arranged and voltage equation is presented in order to calculate the catenary short circuit impedance in Eq. (1).
PPT Slide
Lager Image
where,
  • Z55kV: Catenary impedance on 55 kV terminal [Ω]
  • Ifault: Fault current (= 2I1+ 2I2) [A]
  • Zt: Trolley wire impedance per unit length [Ω/km]
  • Zr: Rail impedance per unit length [Ω/km]
  • Zf: Feeder wire impedance per unit length [Ω/km]
  • D: Distance between SS and SSP [km]
  • m: Distance from SS to fault location [km]
PPT Slide
Lager Image
Current division ratio at Ⓐ in Fig. 1 is as shown in Eq. (2) according to the characteristics of the AT feeding system in Fig. 2 [7] .
PPT Slide
Lager Image
Characteristics of Current division ratio at Ⓐ point
PPT Slide
Lager Image
Current IA and IB depending on current division at point Ⓑ in Fig 1 . are as shown in Eqs. (3) and (4) according to the characteristics of the AT feeding system shown in Fig. 3 .
PPT Slide
Lager Image
Characteristics of Current division ratio at Ⓑ point
PPT Slide
Lager Image
  • VA= (I1+I2+IA+ISS−AT)mZt
  • VB= 3DZtIB+ (D−m)Zt(2kI2+IB)
Because VA = VB , so ,
PPT Slide
Lager Image
PPT Slide
Lager Image
- 2.2 Calculation of catenary impedance between SSP and SP using current division characteristics
Fig. 4 shows the fault current division on the catenary of the up and down track when short circuit fault occurs between SSP and SP on the up track. Catenary impedance ( Z 55kV ) is calculated as shown in Eq. (5) by the voltage equation based on current division characteristics.
PPT Slide
Lager Image
Current flow between sub-sectioning post and sectioning post
PPT Slide
Lager Image
- 2.3 Catenary impedance calculated by impedance relay
Fig. 5 shows the voltage and current measuring point of the impedance relay, which is the main protection of the AT feeding system. It calculates the catenary impedance by acquiring the current of trolley wire and feeder wire and voltage between trolley wire and feeder wire. In the event of a short circuit, catenary impedance at 27.5 kV is 1/4 that at 55kV. When a short circuit fault occurs in the double track system, boosting current is generated and catenary impedance from 55kV as shown in Eq. (6) equals the parallel sum of the up and down track impedances. Therefore, catenary impedance calculated on the up track relay is greater than total catenary impedance at 55kV
PPT Slide
Lager Image
Voltage and current measuring point of impedance relay
PPT Slide
Lager Image
PPT Slide
Lager Image
- 2.4 Calculation of catenary impedance considering boosting current of other tracks
In the existing impedance relay technique, catenary impedance is calculated after acquiring the current of trolley wire and feeder wire and voltage between trolley wire and feeder wire on the up and down track, respectively. Impedance calculated at impedance relay (up track at 55kV) considering the current of trolley wire and feeder wire in Fig. 1 is as described in Eq. (8). Because the denominator is calculated after subtracting the boosting current ( Iboost ) from the fault current ( Ifault ), it is calculated as being greater than the actual catenary impedance ( Z 55kV ).
PPT Slide
Lager Image
When the impedance relay is set based on a calculation method that uses conventional relay, overreach may occur, and fault location estimation errors using the impedance method may increase. Thus, for a more accurate catenary impedance calculation and setting of the operation zone, it is necessary to correct the impedance calculation technique, taking into account the boosting of current magnitude. To that end, Eq. (9) can be obtained by applying boosting
PPT Slide
Lager Image
and arranging Ifault in Eq. (8). It is also confirmed that catenary impedance on the up track (Eq. (9)) is inversely proportional to the magnitude of
PPT Slide
Lager Image
with total catenary impedance (Eqs. (1) and (5)).
PPT Slide
Lager Image
Eq. (10)( Z 55kV(up)−comp ) is total catenary impedance obtained as compensating boosting current( Iboost ) from Eq. (8) to make an equal impedance value( Z 55kV(up) ) calculated by impedance relay with total catenary impedance ( Z 55kV ).
PPT Slide
Lager Image
3. AT Feeding System Simulation and Performance Eluation
- 3.1 System modeling
To verify the performance of the catenary impedance technique considering boosting current compensation, we model an AT feeding system using a power analysis program(PSCAD / EMTDC) in Fig. 6 . For AT feeding system, we model a 3-phase 154kV module supplied from a power company, a railway substation module which converts to two single-phase 55kV, an AT module and a catenary module. The distance between SS, SSP and SP is set as 10km, and the up track and down track are tieconnected at SP. Parameters of each component are provided in Table 1 [9 ~ 11] .
PPT Slide
Lager Image
Model system
Model system parameters
PPT Slide
Lager Image
Model system parameters
- 3.2 Verification of current division characteristics
To verify the current division in the AT feeding system the output is compared using the estimated value from Eq. (2) and the simulation output. Fig. 7 shows the current magnitude divided on point Ⓐ from the simulation, which is almost the same as expected in the estimated value.
PPT Slide
Lager Image
Simulation output of Current division on Ⓐ point
[Estimated value from Eq. (2)]
PPT Slide
Lager Image
To verify the current division characteristics on point Ⓑ, we compare the value estimated using Eq. (3) with the value obtained through the simulation output. Fig. 8 shows the current magnitude divided on Ⓑ, which is almost the same as the estimated value.
PPT Slide
Lager Image
Simulation output of Current division on Ⓑ point
[Estimated value from Eq. (3)]
PPT Slide
Lager Image
- 3.3 Evaluation of impedance estimation performance using simulation
Short-circuit conditions are simulated with the AT feeding system model tie-connected up and down track. Eq. (8), which calculates impedance from protective relay, Eq. (10) and the simulation value are compared. To estimate the track impedance only, short circuit resistance between trolley wire and rail is set as 0.001Ω and a simulation of a short circuit between trolley wire and rail is carried out at 100m intervals starting from the substation.
Fig. 9 and Table 2 show total catenary impedance ( Z 55kV ), impedance ( Z 55kV(up) ) calculated by impedance relay in up track and impedance ( Z 55kV(up)−comp ) calculated by boosting current compensation by distance on the double track of the AT feeding system
PPT Slide
Lager Image
Comparison of simulation output
Comparison of simulation output
PPT Slide
Lager Image
Comparison of simulation output
As shown in Fig. 9 , impedance magnitude from substation is a typical non-linear system. Total catenary impedance magnitude, which is calcuted by parallel sum of catenary impedance on both the up and down track, is less than the impedance measured on the up track. However, catenary impedance magnitude using boosting current compensation is equal to total catenary impedance.
As shown in the simulation output, there is a significant difference between existing impedance estimated by impedance relay and real total catenary impedance. In particular, between SSP and SP the maximum error is doubled because of the increased boosting current. Consequently the farther the distance from the substation, the greater the estimation error.
On the other hand, when an impedance estimation technique that compensates boosting current is applied, maximum error is about 2%, which is considered to be almost the same as catenary impedance. Thus, an estimation technique that considers boosting current between up and down track can more accurately estimate catenary impedance, which would improve the performance of an impedance-based fault locator.
4. Conclusion
This paper presents a catenary impedance estimation technique, which is needed to set a protective relay for protecting the catenary of an AT feeding system. As a conventional impedance relay does not consider the boosting current of another track, there might be differences between actual impedance and estimated impedance magnitude. Such an error could cause a malfunction of the protective relay, and reduce the accuracy of the fault locator. Therefore, this paper presents a technique of compensating boosting current based on current division characteristics depending on impedance distribution of the AT feeding system to minimize errors in the estimation of magnitude by protective relay compared to actual value.
To verify the performance of the technique proposed in this paper, we carry out modeling of an AT feeding system through a power analysis program (PSCAD/EMTDC) and by simulating various operation and fault conditions. As a result, it is found that there is no difference between the magnitudes estimated using the proposed technique and the actual impedance magnitude. When we compare impedance estimated with the conventional technique and the proposed technique, the estimation of magnitude using the conventional technique can have an error of up to 98%, while the error using the proposed technique is within 2%.
After verifying the performance using the operation data obtained from an actual AT feeding system, the technique could potentially be applied to a protection system for protecting catenary.
Acknowledgements
This research was supported by a grant(14RTRPB084184-01) from “Railroad core component/device technology development phase 2” funded by Korean Ministry of Land, Infrastructure and Transport, Republic of Korea
BIO
Hosung Jung He graduated from Sungkyunkwan University in 1995. He received his MSc. and Ph.D. degree in Electrical and Computer Engineering from Sungkyunkwan University, Korea in 1998 and 2002, respectively. He is currently a Principal Researcher and Head of the R&D Strategy Division of Korea Railroad Research Institute. His research interests include protection of electric railway power systems and energy efficient power and railway system technology.
Hyungchul Kim He received his BS and MS degree in Electrical Engineering from Korea University, Seoul, Korea in February 1991 and in February 1993 respectively. He then worked for LG electronics Inc. for 6 years. He received a Ph.D. degree from Texas A&M University in August 2003. Currently, He is working for Korea Railroad Research Institute. His research area is traction power system and power system reliability
Sang-Hoon Chang He received his Ph.D degree in department of electrical engineering from Hongik University in Korea. He has been working for Korea Railroad Research Institute(KRRI) in Korea since 1994. His special fields of interest include power supply system design and analysis for electric railway system.
Joorak Kim He received his B.S, M.S., Ph.D. degree in electrical engineering from Hongik university in 1997, 1999, and 2010, respectively. He is currently senior researcher in Korea Railroad Research Institute. His research interests are design and analysis of traction power supply system.
Myung-Hwan Min He received his B.Sc. degree in electrical engineering from Soongsil University, Korea in 2010 and his M.Sc. degree from Sungkyunkwan University, Korea, in 2012. He is currently working for ENTEC Electric & Electronic, Ltd. His research interests include the protection of electric generators, power distribution and electric railway power systems.
Tae-Pung An He received his B.Sc. degree in electronic engineering from Sungkyunkwan University, Korea in 1992. He is currently working for ENTEC Electric & Electronic, Ltd. as a managing director of the technical research center. His research interests include power system protection as well as communication systems.
Sung-Il Kwon He received his B.Sc. degree in electrical engineering from Choong-ju National University, Korea, in 1996 and his M.Sc. degree from Chungbuk University, Korea, in 2012. He is currently working for Korea Railroad Corp. as a director in the rail systems development research center. His research interests include railway power systems
References
2014 “protection and insulation coordination”, KR Code 2012
Jung Hosung 2005 “A study on relay setting for AT feeding system protection using PSCAD/EMTDC” ICEE 2005 A76 - A81
Chang Chin-Young 2015 “A Design of Prototype 1C2M Railway Vehicle Propulsion Control System Considering Slip Reduction of Traction Motor” Journal of Electrical Engineering and Technology 10 (1) 429 - 435    DOI : 10.5370/JEET.2015.10.1.429
Jung Hosung 2011 “A Study on Fault Location Estimation Technique Using the distribution Ratio of Catenary Current in AC Feeding System” Journal of the Korean Society for Railway 14 (5) 404 - 410    DOI : 10.7782/JKSR.2011.14.5.404
Sezi Tevfik , Menter Frank E. 1999 “Protection Scheme for a New AC Railway Traction Power System” IEEE Transmission and Distribution Conference 1 388 - 393
2010 “Numerical Overhead Contact Line Protection for AC Traction Power Supply 7ST6”
Jo Yong-Hwan 2013 “A Fast Algorithm of the Apparent Factor Calculation for Distance Relay Setting without Fault Analysis” Journal of Electrical Engineering and Technology 8 (1) 64 - 69    DOI : 10.5370/JEET.2013.8.1.064
Jung Hosung 2013 “A Study on Real Time Catenary Impedance Estimation Technique using the Synchronized Measuring Data between Substation and Train” The Transactions of the Korean Institute of Electrical Engineers 62 (10) 1458 - 1464    DOI : 10.5370/KIEE.2013.62.10.1458
Jung Hosung 2014 “The Study on Impedance Characteristic Using Current Division in AT Feeding System” ICEE 2014
Jang Gilsoo 2014 “Development of AC/DC Hybrid Simulation for Operator Training Simulator in Railway System” Journal of Electrical Engineering and Technology 9 (1) 52 - 59    DOI : 10.5370/JEET.2014.9.1.052
Jung Hosung 2014 “A Study on Estimation Method of Short Circuit Impedance for the Zone between SSPSP in AT Feeding System” KIEE Summer Conference 2014 1692 - 1693