Hardware-in-the-loop Simulation Method for a Wind Farm Controller Using Real Time Digital Simulator
Hardware-in-the-loop Simulation Method for a Wind Farm Controller Using Real Time Digital Simulator
Journal of Electrical Engineering and Technology. 2014. Sep, 9(5): 1489-1494
Copyright © 2014, The Korean Institute of Electrical Engineers
  • Received : September 05, 2013
  • Accepted : April 16, 2014
  • Published : September 01, 2014
Download
PDF
e-PUB
PubReader
PPT
Export by style
Article
Author
Metrics
Cited by
TagCloud
About the Authors
Gyeong-Hun Kim
Corresponding Author: Smart Distribution Research Center, Korea Electrotechnology Research Institute, Korea. (kgh1001@keri.re.kr)
Jong-Yul Kim
Smart Distribution Research Center, Korea Electrotechnology Research Institute, Korea. (jykim@keri.re.kr)
Jin-Hong Jeon
Smart Distribution Research Center, Korea Electrotechnology Research Institute, Korea. (jykim@keri.re.kr)
Seul-Ki Kim
Smart Distribution Research Center, Korea Electrotechnology Research Institute, Korea. (jykim@keri.re.kr)
Eung-Sang Kim
Smart Distribution Research Center, Korea Electrotechnology Research Institute, Korea. (jykim@keri.re.kr)
Ju-Han Lee
Dept. of Electrical Engineering, Changwon National University, Korea. (paku@changwon.ac.kr)
Minwon Park
Dept. of Electrical Engineering, Changwon National University, Korea. (paku@changwon.ac.kr)
In-Keun Yu
Dept. of Electrical Engineering, Changwon National University, Korea. (paku@changwon.ac.kr)

Abstract
A hardware-in-the-loop simulation (HILS) method for a wind farm controller using a real time digital simulator (RTDS) is presented, and performance of the wind farm controller is analyzed. A 100 MW wind farm which includes 5 MW wind power generation systems (WPGS) is modeled and analyzed in RSCAD/RTDS. The wind farm controller is implemented by using a computer, which is connected to the RTDS through transmission control protocol/internet protocol (TCP/IP). The HILS results show the active power and power factor of the wind farm, which are controlled by the wind farm controller. The proposed HILS method in this paper can be effectively utilized to validate and test a wind farm controller under the environment in practice without a real wind farm.
Keywords
1. Introduction
Among the renewable energy such as wind turbines, photovoltaic, fuel cells, micro gas turbines, and, small hydro units, wind turbines have significantly increasing all over the world [1] . According to global wind energy council, a total of 282 GW is now installed in 2012, and an increase in installed cumulative capacity of a wind power generation system (WPGS) is about 18.6% compared to the previous year [2] .
Increase of wind farm in power system affects the power balancing between generated and demanded power caused by unstable wind velocity [3] . Unstable wind velocity can cause significant variation in the system frequency that may affect grid system stability [4] . Hence, the grid system operators in many centuries such as Denmark, Germany, Spain, US, China, and so on requires grid code for a WPGS or a wind farm [5 , 6] .
For satisfying the grid code, a wind farm controller (WFC) is needed because it requires the possibility for controlling active and reactive power in point of common coupling (PCC), continuous operation in a limited range, and rate limit operation. The WFC should have ability to sending out set points to all WPGSs, and each WPGS must be able to ensure set points from the WFC. It enables the wind farm to control active and reactive power in PCC [7] .
Before the WFC is applied to the wind farm, it is difficult to evaluate and validate the WFC because of security problem of the power system, cost, and development time. This paper presents performance analysis method without a wind farm to evaluate a WFC using hardware-in-theloop- simulation (HILS) using a real time digital simulator (RTDS).
A 100 MW wind farm which is composed of twenty 5 MW WPGSs is modeled in RSCAD / RTDS for applying the proposed performance analysis method using HILS, and the modeled wind farm is simulated at real time by the RTDS. The control algorithm [8] of WFC is implemented using C# programing language in a computer. A communication interface between real time simulation and the WFC is also implemented through TCP/IP.
The HILS results show the active power and power factor at PCC of the wind farm controlled by the WFC. The dynamic performances of several wind turbines are also depicted when they are controlled by the WFC. Using the proposed HILS method, a newly designed and developed WFC can be effectively tested and validated under the environment in practice without a real wind farm.
2. Wind farm model
The configuration of a wind farm is depicted in Fig. 1 , which is modeled in RTDS. A total rated power of the wind farm is 100 MW, and it has twenty WPGSs, a substation.
PPT Slide
Lager Image
Configuration of the wind farm
It is made up of 5 MW variable speed WPGS, which use a permanent magnet synchronous generator (PMSG) and a back-to-back voltage source converter. The WPGS is connected to medium-voltage (MV) at 33 kV. The MV is boosted up to 154 kV by using two 60 MW step-up transformers. The substation is connected to the PCC through 20 km long cable. Table 1 shows parameters of the 100 MW modeled wind farm.
Parameters of 100 MW modeled wind farm
PPT Slide
Lager Image
Parameters of 100 MW modeled wind farm
- 2.1 Modeling of wind power generation system
In this paper, a 5 MW variable speed WPGS is modeled in RSCAD / RTDS. The WPGS consists of the PMSG, whose stator winding is directly connected to a bidirectional frequency converter made up of two back-to-back IGBT bridge. However, there is a constraint of operation time and processor card [9] of the RTDS for implementing the real time simulation. For the reason, a simplified model of the WPGS [10] is considered as shown in Fig. 2 , which includes a three phase current source and wind turbine model.
PPT Slide
Lager Image
Configuration of the modeled 5 MW wind power generation system in RSCAD/RTDS
- 2.2 Modeling of wind turbine
In the case of the wind turbine model, the mechanical torque ( Tm ) of the turbine captured from the wind power can be calculated by
PPT Slide
Lager Image
where ρ is the air density (kg/m 3 ), v is wind velocity (m/s), R is the radius of blade (m), ω is angular velocity (rad/s), Cp is power coefficient [11] .
The power coefficient is a function of tip speed ratio ( λ ) and pitch angle (β) of the blade (degree) as follows (2).
PPT Slide
Lager Image
PPT Slide
Lager Image
where c1 is 0.5176, c2 is 116, c3 is 0.4, c4 is 5, c5 is 21, and c6 is 0.0068 [12] . Parameters of the 5 MW wind turbine model are given in Table 2 . The maximum power coefficient ( Cp_max ) is 0.48 when tip speed ratio is 8.1 (λ opt ).
Parameters of 5 MW wind turbine model
PPT Slide
Lager Image
Parameters of 5 MW wind turbine model
The controller of maximum power point tracking (MPPT) calculates the power reference ( Pmppt ), which is given by (3).
As in (4), the rotation speed of the wind turbine is used to determine the power reference of MPPT. In the case of over rated power, the power reference is limited to the 5 MW.
PPT Slide
Lager Image
- 2.3 Power controller of the simplified model
The three phase current source of the modeled 5 MW WPGS is controlled by power controller as represented in Fig. 3 . References of DQ-axis current component frame are used for control of the active and reactive power, whose reference is received from the WFC.
PPT Slide
Lager Image
Power controller of the simplified wind turbine model
As shown in Fig. 3 , the reference power of MPPT control is limited by active power commands ( Pref_wt and Pmin_wt ) from the WFC. The reactive power of WPGS is controlled to reactive power commands ( Qref_wt ). If the active power command from the WFC is smaller than the reference power of the MPPT control, the output power of wind turbine is limited. It causes an increase of the rotation speed of the wind turbine because of difference in torque between the electrical output power and the mechanical power. In that case, the rotation speed of wind turbine is regulated by pitch angle controller.
Fig. 4 shows the block diagram of the pitch angle controller, which increases pitch angle for the purpose of regulating the rotation speed [13] . The pitch angle is limited to 3°/s for realistic response.
PPT Slide
Lager Image
Block diagram of the pitch angle controller
3. Implementation of Hardware in the Loop Simulation for Test of Wind Farm Controller
The configuration of HILS setup for test of wind farm controller is depicted in Fig. 5 . The WFC is implemented using C# programing language, which is operated by a computer.
PPT Slide
Lager Image
Configuration of hardware in the loop simulation setup for test of the integrated controller
The WFC can connect to the real time simulation model of the 100 MW wind farm through an Ethernet switch between RTDS and the integrated controller. It provides the same communication environment in practice. The modeled wind farm is simulated with 50 μs time step in real time.
The operation data such as the total active ( Pwf ) and reactive power ( Qwf ) of the wind farm, the active and reactive powers of each WPGS ( Piwt and Qiwt ), values of pitch angles and rotation speed is sent to the integrated controller. The integrated controller calculates each WPGS’s active and reactive power commands ( Piwt_ref and Qiwt_ref ) for controlling the total active and reactive power of the wind farm.
- 3.1 Wind farm controller
Fig. 6 shows the control algorithm [8] of the WFC. Total active and reactive power references of the wind farm ( Pwf_ref and Qwf_ref ) are required by grid operator. The active power reference of wind farm is limited to 1 MW/s by ramp rate, and the power is controlled by PI controller. The active power reference of each WPGS is calculated by dispatch control and weight value ( PFiwt ) in (5).
PPT Slide
Lager Image
Control algorithm of the integrated controller
PPT Slide
Lager Image
The available reactive power of the wind farm depends on the active power because of the current capacity of the back to back converter. The available reactive power of the wind farm is sum of each available reactive power of the WPGSs as follows in (6).
PPT Slide
Lager Image
The reactive power reference of each WPGS is also calculated by dispatch control and weight value ( QFiwt ) in (5).
4. Hardware in the Loop Simulation Results
Fig. 7 shows the wind speed at number 1, 8, 20 WPGSs used in the real time simulation. The output powers of the wind farm under MPPT operation mode and dispatch operation mode are compared as shown in Fig. 8 . All WPGSs operates MPPT control mode during 0 to 175 s. About 175 s, the power reference of the wind farm is 30 MW, which is supposed that the grid operator requires. As shown in Fig. 8 , the active power of wind farm is controlled to its reference. At that time, the dynamic performances such as rotating speed and pitch angle of number 1, 8, 20 WPGSs are shown in Figs. 9 - 11 .
PPT Slide
Lager Image
Wind speed at 1, 8, 20 WPGSs
PPT Slide
Lager Image
Output power of the wind farm applying to the integrated controller
PPT Slide
Lager Image
Wind speed, output power, rotating speed, pitch angle of the #1 WPGS
PPT Slide
Lager Image
Wind speed, output power, rotating speed, pitch angle of the #8 WPGS
PPT Slide
Lager Image
Wind speed, output power, rotating speed, pitch angle of the #20 WPGS
The output power of the #1 wind turbine is unchanged after dispatch operation mode as shown in Fig. 9 . However, the pitch angle of #1 wind turbine increases under below rated output power. That means the power reference of #1 wind turbine is limited to about 2 MW from the WFC. In the case of the # 8 wind turbine, the output power is gradually decreases after dispatch operation mode. The rotation speed and pitch angle of # 8 wind turbine are increase because the output power is limited by the WFC. In the case of the # 20 wind turbine, the output power is gradually increases despite of dispatch operation mode. It is expected that the available power of the # 20 wind turbine is high. However, at last, the rotation speed is regulated by pitch angle controller under below rated wind speed. That means the output power of # 20 wind turbine is also limited by the WFC.
The power factor and reactive power of the wind farm is shown is Fig. 12 . After 32.5 s, the power factor reference is 0.96, which is supposed that the grid operator requires. After then, reactive power increases follow active power for satisfying power factor reference.
PPT Slide
Lager Image
Power factor and reactive power of wind farm
5. Conclusion
Performance analysis method to evaluate the WFC using hardware in the loop simulation (HILS) is presented. The integrated controller with 100 MW wind farm is tested and analyzed by using the proposed method. The test results show that the WFC is well operated under HILS environment. The proposed test method in this paper can be effectively utilized to test and develop a wind farm controller under the environment in practice without real wind farm.
BIO
Gyeong-Hun Kim He received his B.S. and M.S. and Ph.D. degrees in Electrical Engineering from Changwon National University, Korea in 2007, 2009, and 2013, respectively. Currently, he is a senior research engineer with the Smart Distribution Research Center, KERI. His research interests are operation and control of a wind power generation system.
Jong-Yul Kim He received his B.S. and M.S. and Ph.D. degrees in Electrical Engineering from Pusan National University, Korea in 1997, 1999, and 2010, respectively. Currently, he is a senior research engineer with the Smart Distribution Research Center, KERI.
Jin-Hong Jeon He received his B.S. and M.S. from Sungkyunkwan University in 1995 and 1997, respectively, and his Ph.D. from Pusan National University, Korea, in 2012, in the department of electrical engineering. Currently, he is a principal researcher with the smart distribution research center, KERI.
Seul-Ki Kim He received the B.S., M.S and Ph.D. degrees in electrical engineering from Korea University, Seoul, Korea, in 1998, 2000 and 2010 respectively. Currently, he works as a senior researcher with the smart distribution research center, Korea Electrotechnology Research Institute (KERI).
Eung-Sang Kim He received the B.S. degree in electrical engineering from Seoul National University of Technology and the M.S. and Ph.D. degree in electric engineering from Soong-Sil University. Currently, he works as a director in the smart distribution research center, Korea Electrotechnology Research Institute(KERI), Changwon, Korea.
Ju-Han Lee He received B.S degree in electrical engineering from Changwon University. His research interests are wind power generation system and power control scheme.
Minwon Park He received B.S degree in Electrical Engineering from Changwon National University in 1997 and his Master’s degree and Ph.D. degrees in Electrical Engineering from Osaka University in 2000 and 2002, respectively.
In-Keun Yu He received B.S degree in Electrical Engineering from Dongguk University in 1981 and his M.S. and Ph.D. degrees in Electrical Engineering from Hanyang University in 1983 and 1986, respectively. His research interests are wavelet transform applications, electric energy storage and control systems, peak load management & energy saving systems, PSCAD/ EMTDC and RTDS simulation studies, and renewable energy sources.
References
Jeong Hae-Gwang , Lee Jong-Hyun , Lee Kyo-Beum 2013 “A 2nd order harmonic compensation method for wind power system using a PR controller” Journal of Electrical Engineering & Technology 8 (3) 507 - 515    DOI : 10.5370/JEET.2013.8.3.507
Fried Lauha 2013 “Global wind statics 2012,” Global Wind Energy Council
Sørensen Poul , Cutululis Nicolaos Antonio , Vigueras-Rodriguez Antonio , Jensen Leo E. , Hjerrild Jesper , Donovan Martin Heyman , Madsen Henrik 2007 “Power Fluctuations From Large Wind Farms,” IEEE Trans. on Power Systems 22 (3) 958 - 965    DOI : 10.1109/TPWRS.2007.901615
Lee Sung-Eun , Won Dong-Jun , Chung Il-Yop 2012 “Operation scheme for a wind farm to mitigate output power variation,” Journal of Electrical Engineering & Technology 7 (6) 869 - 875    DOI : 10.5370/JEET.2012.7.6.869
Altin Müfit , Göksu Ömer , Teodorescu Remus , Rodriguez Pedro , Jensen Birgitte-Bak , Helle Lars 2010 “Overview of Recent Grid Codes for Wind Power Integration,” OPTIM 2010 Conference
Sim Jun-Bo , Kim Ki-Cheol , Son Rak-Won , Oh Joong-Ki 2012 “Ride-through of PMSG wind power system under the distorted and unbalanced grid voltage dips,” Journal of Electrical Engineering & Technology 7 (6) 898 - 904    DOI : 10.5370/JEET.2012.7.6.898
Rodriguez-Amenedo José Luis , Arnalte Santiago , Burgos Juan Carlos 2002 “Automatic Generation Control of a wind farm with variable speed wind turbines,” IEEE Trans. on energy conversion 17 (2) 279 - 284    DOI : 10.1109/TEC.2002.1009481
Altin Mufit , Teodorescu Remus , Bak-Jensen Birgitte , Rodiriguez Pedro , Iov Florin , Kjaer Philip C. 2010 “Wind Power Plant Control-An Overview” GmbH Proceedings on the 9th International Workshop on Large-Scale Integration of Wind Power into Power Systems
Forsyth P. , Maguire T. , Kuffel R. 2004 “Real time digital simulation for control and protection system testing” Proc. 35th Annual IEEE Power Electron. Spec. Conference 329 - 335
Kim Gyeong-Hun , Bae Hyeong-Heak , Kim Sang-Yong , Hwang ChulSang , Lee Hyo-Guen , Kim Namwon , Seo Hyo-Rong , Park Minwon , Yu In-Keun 2010 “Application of a Battery Energy Storage System for Power Quality Improvement of Jeju Power System” ICEMS 2010 Conference Incheon, Korea
Heier Siegfried 1998 “Grid integration of wind energy conversion systems” John Wiley & Sons Ltd 34 - 36
Rosadi M. , Muyeen S. M. , Takahashi R. , Tamura J. 2011 “Transient stability enhancement of variable speed permanent magnet wind generator using adaptive PIFuzzy controller” Powertech Conference Trondheim 1 - 6
Rasila M. 2001 “Torque and speed control of a pitch regulated wind turbine”, Technical reporter No. 1A Department of Electric Power Engineering, Chalmers University Goteborg (Sweden) IEEE PES SM2001 Conference Vancouver, Canada